Scores of highrise buildings and houses in seven residential sectors (58-64, alongside Southern Peripheral Road) constructed in the catchment house of Ghata bundh face an enduring chance of flooding during monsoons, or any episode of heavy rainfall, because the catchment is formed like a gradient that will naturally carry rainwater dashing against the lower side.
Housing projects in 7 sectors built in Ghata lake area prone to flooding
Reviewed by Kailash
on
June 07, 2019
Rating: