The supplementary chargesheet filed in the Himalaya bridge cave in case of March 14 that led to the demise of seven other people and left over 30 injured has published that the condition of the bridge had drastically deteriorated. A check for thickness of the go beam at the bridge which cracked discovered it had diminished to 2mm from 15mm.
'15 mm bridge beam reduced to 2 mm by corrosion'
Reviewed by Kailash
on
May 31, 2019
Rating: